Table of Contents
How much aggregate do I need for M15 concrete?
Cement, Sand and aggregate requirement for Different grade concrete
Grade of Concrete | Nominal Mix Proportion | Aggregate Required (in cft) |
---|---|---|
M15 | 1:3:6 | 32.07 |
M20 | 1:2:4 | 29.96 |
M25 | 1:1.75:3.5 | 29.14 |
M30 | 1:1.5:3 | 28.11 |
How do you calculate sand and aggregate quantity in M15 concrete?
- Calculate cement quantity in m15 concrete. Density of cement = 1440 kg/m3. Volume of cement = (1/7) 1.54 m3.
- Calculate sand quantity in m15 grade of 1m3 concrete. 1m3 = 35.32 cuft. Volume of sand =( 2/7) 1.54 × 35.32.
- Calculate aggregate quantity in m15 grade of 1m3 concrete. Volume = (4/7) 1.54 × 35.32.
What is the quantity of cement sand and aggregate?
Number of Cement bags and Volume of Sand and Aggregate required for different Concrete Grades
GRADE | CEMENT | SAND |
---|---|---|
M15 | 6.4 bags | 15.82cft |
M10 | 4.5 bags | 16.64cft |
M7.5* | 3.38 bags | 16.64cft |
M5* | 2.7 bags | 16.64cft |
How many bags of cement are required in 1m3 of M15?
6.336 bags cement, 15.54 cu ft sand and 31 cu ft aggregate are quantity of material required for m15 grade of 1m3 (cubic metre) concrete.
How do you calculate M15?
SAND
- Quantity of Sand in Cubic Meter. Cubic Meter = DRY Volume of Concrete x ( Ratio of Sand / Sum of Total Ratio) = 1.54 x (2/7) = 0.44 Cubic Meter.
- Quantity of Sand in KG. KG = DRY Volume of Concrete x ( Ratio of Sand / Sum of Total Ratio) x Density of Sand. = 1.54 x (2/7) x 1450. = 638 KG.
- Quantity of Sand in Cubic Feet.
What is the ratio of cement sand aggregate of mix M25?
M25 concrete mix ratio is 1:1:2, made of mixture of cement, sand and aggregate in which one part is cement, 1 part is sand and 2 part is aggregate or stone mix with water.
How do you mix M15 concrete?
M15 ratio is 1:2:4 in which one part is cement, 2 part is sand and 4 part is aggregate mix with water.