How much a Labour can excavate in a day?
, 20 years of experience in commercial and industrial construction. Originally Answered: How many excavators would be needed to excavate a 100,000 sq. ft. lot (12′ deep) in 2 business weeks?
How much should I charge for excavation?
Excavation Costs A typical residential excavation job runs between $1,447 and $5,325 with an average of $3,323. Though most companies charge anywhere from $40 to $150 an hour, residential jobs receive project bids. Project bids reflect cubic yards of dirt moved, anywhere from $50 to $200 per cubic yard.
How do you calculate excavation cost?
The cost of excavation is generally estimated by multiplying the total excavation volume to the excavation price per unit. For ex : Let us assume that you want to excavate a pit of size : 2 x 2 x 2 meter. The market price for excavation is 10$/cu. m.
How much cubic meter JCB can excavate?
The excavation capacity of the JCB ranges from 700 cu ft. to 1100 cu ft. per hour, depending upon the type of soil & bucket capacity. Let us consider an average excavation capacity of 900 cu ft./ hour for the calculation. But when we do the excavation practically, the JCB takes 3mins.
How much does excavation cost per m3 in India?
Example of Rate Analysis of Excavation in Earthwork
Sr No. | Description | Cost |
---|---|---|
Details of cost for 10.00 Cu.m. | ||
A | Machinery | |
1 | Backhoe Excavator ( Per Day Excator 200 Cu.m.) | 350.00 |
2 | Tractor/Dumper | 100.00 |
How do you calculate excavation slope?
For example, if the trench is 6 ft deep and 20 ft wide across the end of the trench and the bottom of the trench is 2 ft wide, the slope can be calculated as follows: Horizontal distance = 20 ft – 2 ft ÷ 2 = 9 and the Vertical depth = 6 ft; Slope = 9 ÷ 6 = 1.5 to 1, which is the slope needed for type C soil.
What is land excavation?
Land Excavation Cost The first step in building site preparation is land excavation. It is a mandatory step in building site preparation that costs between $200 and $2,000 per acre. The space for the footing and foundation and the trenches for utilities are excavated during this step of the process.
How is Labour coefficient calculated?
To calculate the labor cost percentage, divide your labor cost by gross sales. Multiply the result by 100. Let’s say gross sales are $500K, with a total labor cost of $140K. Divide $140K by $500K, then multiply by 100.
How to calculate the cost of 10m3 of excavation?
Then the cost of 10m 3 of excavation can be calculated as: No. of days required for 10m 3 excavation = 10/242.4242 = 0.04125 days. The cost of hydraulic excavator for 10m 3 excavation = 0.04125×5000 = Rs.206.25 Likewise, based on the capacity of other equipment, labors etc., their cost is calculated.
What is the minimum depth of excavation required for construction?
For depth upto 1.5m For depth between 1.5m to 3m. For depth between 3.m to 4.5m. For depth more than 4.5m The depth of excavation required varies from project to project and from place to place. Many factors influence the depth of excavation.
What is the rate analysis of excavation in earthwork?
Rate analysis of excavation in earthwork is the measure of quantity of excavation to be carried out, the cost of equipment, machineries and labors required for the same. The cost of excavation depends on the depth of excavation, type of soil, method of excavation to be carried out and the distance where the excavated soil has to be disposed.
What is meant by General amount of soil to be excavated?
general amount of soil to be excavated – take a note, that the planned or calculated amount of the soil to be removed will slightly differ from the actual amount of it. It happens because the soil is disturbed and similar compressed. As a result an actual amount of the soil will be larger;