What are schedule and non schedule items?
Scheduled and non scheduled goods | Carriage of Goods | Areas of Law | Law Library | AdvocateKhoj. Goods are classified into scheduled and non-scheduled categories. Goods of high value are termed as scheduled goods. For e.g. gold coins, precious stones, currency notes, work of art, articles of ivory or sandalwood.
What are non scheduled items?
1. not according to a schedule or plan; unscheduled.
What is a schedule of rates in construction?
A schedule of rates is a list in a contract setting out the staff, labour and plant hire rates etc that a contractor will use for pricing cost reimbursable work.
What is basic rate schedule?
Basic Schedule of Rates or BSR means the schedule of rates issued under the appropriate authority of PWD from time to time. Words imparting the singular number include the plural number or vice versa. Sample 1. Sample 2.
What is DSR in civil engineering?
Schedule of Rates. The latest version of Delhi Schedule of Rates (DSR) shall be the basis for preparation of estimate. The rates entered in the estimates should generally agree with the scheduled rates, but where due to any reason, the later are not available, market rates may be considered.
What is SSR in civil engineering?
Standard Schedule Of Rates (SSR) – Best Civil Engineer.
What is a scheduled product?
Related Definitions Scheduled Product means the quantity of Product confirmed by the parties or Carrier, as applicable, for movement, transportation or management.
What is DSR construction?
The detailed estimates shall be prepared based on latest Delhi schedule of rates (DSR) and State Schedule of Rates (SOR), as applicable. Alternatively if the items and the nature of work does not match with DSR, the detailed estimate shall be considered for preparation based on the other schedule of rates (SOR).
What is Sor civil?
SOR – Schedule of rates.
What is the unit of supply of brick?
Units of Measurement for Payments of Civil Construction Works
Sl. No. | Civil Construction Works | Units of measurement |
---|---|---|
8 | Brick work of any description | m3 |
9 | Thin partition wall | m2 |
10 | String course, drip course, water course coping etc. | m |
11 | Stone work of any description | m3 |
What is the full form of DPC in construction?
DPC (Damp Proof Course) as the name suggests is a layer of water-repelling material provided between the source of dampness and the building component in order to prevent the dampness in the building.
What is SSR and DSR?
A number of protocols have been developed insofar to facilitate the administration, management and operation of such networks; for packet routing, in particular, two of the most widespread protocols are DSR (Dynamic Source Routing) and SSR (Signal Stability Routing).
What is a schedule of work?
Schedules of work (or schedule of works) are ‘ without quantities ‘ instructional lists often produced on smaller projects or for alteration work.
What are the technical specifications for non-scheduled items?
For non-scheduled items, technical specifications have to be very carefully written or drafted in order to avoid any dispute regarding the quality of materials, their manufacture or any particular sizes (cross-section) to be used. A comparison of rates entered in BOQ will enable the most favorable tender to be accepted.
What is the difference between a specification and a schedule?
Schedules simply list the work required. Any information about quality should be provided by reference to specifications, and information about location and size should be provided on drawings. Where a schedule includes a description of the work required, this is a ‘specified’ schedule of work .
What is a schedule of rates in a contract?
A schedule of rates is a list in a contract setting out the staff, labour and plant hire rates etc that a contractor will use for pricing cost reimbursable work. It does not contain any quantities for the specific work items and is typically used when the nature of work required is known but it cannot be quantified, or if continuity of