What is non interlocking in railway?
Non Interlocking Working means temporary disconnection of points, signals, track circuits, axle counters and other signaling gadgets for any designated works.
How many types of interlocking are there?
There are three types of interlocks: – mechanical, – electrical, – logical.
How many interlocking are there in railway?
29006. Standards of Signalling and Interlocking. – Interlocking at stations is standardised into three different classes viz. I, II and III.
What is panel interlocking in railway?
Panel Interlocking (PI) is the system used in most medium-sized stations on IR. In this, the points and signals are worked by individual switches that control them. Route Relay Interlocking (RRI) is the system used in large and busy stations that have to handle high volumes of train movements.
What is NI work in railway?
Non-interlocking work refers to the dismantling of existing signalling equipment (not necessarily old technology) for commissioning a new signaling system at any station or section of railways. The manual system can at best be 50 per cent efficient as that of the interlocked system.
What is RRI in railway?
RRI is a system by which all the signals and the points or crossings which are used for changing of routes at junction station are operated centrally from a cabin through electrical devices.
What is mechanical interlock?
In the context of metallurgy, mechanical interlocking refers to the first stage in the process of adhesion where adhesives are used to join two or more materials. In order to result in good adhesion, adhesive must penetrate any pores and irregularities.
What is Route delay interlocking?
Route Relay Interlocking system is one of the important signalling systems for major yards in Indian Railways. The basic knowledge of this system can help the signal personnel in maintenance and troubleshooting of the installation under their jurisdiction.
What is RRI cabin in railway?
What is the purpose of interlock?
In most applications, an interlock is used to help prevent a machine from harming its operator or damaging itself by preventing one element from changing state due to the state of another element, and vice versa.
What is the full form of CRS in railway?
The Commission of Railway Safety (CRS) , working under the administrative control of the Ministry of Civil Aviation of the Government of India, deals with matters pertaining to safety of rail travel and train operation and is charged with certain statutory functions as laid down in the Railways Act (1989), which are of …
What is non-interlocking work?
Non-interlocking work refers to the dismantling of existing signalling equipment (not necessarily old technology) for commissioning a new signaling system at any station or section of railways.
What is a non-interlocked station?
Non-interlocked stations are what their name implies: there is no interlocking of any kind. The points have to be set appropriately and locked manually before pulling off a signal. The station master is personally responsible for ensuring that this is done and is supposed to have the keys to unlock the points with him or under his control.
How many levels of interlocking are there in railway stations?
There are three levels of interlocking used by IR. A Standard I interlocked station has mechanical interlocking. It also usually has just one running line and a loop line (and perhaps a couple of sidings). These are usually branch line stations.
What is ni work in railway stations?
The entire station that comes under NI work is divided into segments from the home signal (signal at station entry) on one end to the last stop signal (signal at station exit), also known as the advance starter. Each segment has a goomty (a hut) erected with facilities like furniture, water, statutory registers, point clamps and locks.