What is purpose of bill of quantities?
It facilitates all contractors tendering for a contract to price on precisely for the same information. By providing the quantities to tenderers, bill of quantities gives a basic idea of the project. BOQ describes the scope of the work to be completed.
What is Bill of Quantity in civil engineering?
BoQ means a bill of quantity is a document prepared by a cost estimator to calculate the exact costing of project work by multiplying item work by their rate. It is the most important document for tendering and contracting.
How do you prepare a bill of quantities?
Drafting Your Bill of Quantities. Set up a spreadsheet for your bill of quantities. Include columns for the item numbers, description, unit of measurement, quantity, rate for the item, labor, and total cost for the item. Your item numbers will be consecutive, starting from 1.
How do you do a bill of quantities?
What is included in bill of quantities?
A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. Preparing a bill of quantities requires that the design is complete and a specification has been prepared.
What are the components of a bill of quantities?
For the preparation of BOQ, 5 main components are to be considered which are as follows:
- Item Description.
- Unit.
- Quantity.
- Rate per unit.
- Total Amount.
What are the types of bill of quantity?
According to NRM2, RICS new rules of measurement, Detailed measurement for building work, there are two types of bill of quantities; firm and approximate.
How do I prepare BOQ guidelines?
Steps by step guideline how to prepare boq for tender
- Don’t add or delete Rows from 1 to 12 and the last two Rows.
- If you want to add Rows between Row No.
- Sl No, Item Code, Quantity and Units Column Should not be blank, Sl.
- Edit columns according to your requirement, if not required hide those Columns.
Is a bill of quantities a contract document?
The Bill of Quantities is a contract document (see option B clause 11.2 (21)). The Bill of Quantities is not the same as the Works Information (see option B clause 55.1)
What are the details of a bill of quantities?
Details of Bill Of Quantities. A bill of quantities (BOQ) stands for a document to be utilized for tendering purpose in the construction industry / supplies. In a BOQ, all the details for materials, parts, and labor (and their costs) are indexed.
What are the advantages and disadvantages of preparing Bill of quantities?
Preparing bill of quantities has many benefits and drawbacks. The main advantages of bill of quantities are: Simplified tender analysis. It saves the cost and time of several contractors measuring the same design in order to.
What are the benefits of Boq data?
Asset management which means BOQ provides data for asset management of the completed projects, life cycle cost, maintenance schedules, general insurance and insurance-replacement costs. Taxation. Priced bill of quantities database details will assist future feasibility estimating and cost planning.
What is a bill of quantities in RICS?
According to RICS New Rules of Measurement: NRM2 ” A bill of quantities means a list of items giving detailed identifying descriptions and firm quantities of the work comprised in a contract.” It provides almost exact measured quantities and works descriptions identified in the drawings and specifications of the project.