What should be included in a BIM Execution Plan?
Elements of BIM Execution Plan
- Roles and responsibilities of each team.
- Strategy planning of key deliverables.
- Set key project milestones & their timeline.
- Well planned logistics of collaborative processes (i.e. BIM Modeling)
- Project Information Plan (PIP)
What is execution plan in project management?
The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects. The plan serves as the main communication vehicle to ensure that everyone is aware and knowledgeable of project objectives and how they will be accomplished.
What are the critical steps to get right at the start of a BIM project?
BIM COORDINATION KICKOFF MEETING AGENDA
- Existing model availability.
- File formats to use for coordination.
- Software used by different stakeholders.
- Origin & orientation in tools.
- Frequency of coordination meetings.
- Tea / coffee / beer / tequila break depending on how well that went.
Who prepare a BIM Execution Plan?
The BIM Execution Plan (BEP) is a crucial component of any BIM Level 2 project. The British Standards Institution describes the BEP as a plan prepared by the suppliers to explain how the information modelling aspects of a project will be carried out.
What are the two types of BIM Execution Plan?
There are mainly 2 types of BIM Execution Plans. Pre-Contract BEP and Post-Contract BEP.
What is BIM Execution Plan template?
A BIM Execution Plan Template is a baseline document to be used when preparing a BIM Execution Plan (BEP) for any BIM project. This document is one of the essential guides provided by the Singapore Authority known as Building Construction Authority (BCA). This document can be found on the BCA’s website.
How do you write a project execution plan?
Define WBS objectives and company goals
- Decision on the size and timing of the project.
- Identify the objectives and goals to be achieved (feasible and quantifiable)
- Agreement of the goals with the stakeholders.
- Implementation of method for monitoring project execution.
- Monitoring and control.
How do you write an execution plan?
Read more in The Importance Of Adopting Your Own Goal-Setting System
- Create a Strategic and Detailed Outline of Tasks. Make a strategic outline that details the goals, objectives and methods for the execution.
- Have Everyone Write a Narrative ‘Memo’ About the Project.
- Keep the Momentum Going With an Agile Structure.
How can I improve my BIM?
Since you’re already creating the model for documentation, you should get the most out of its data and your efforts.
- Develop Your BIM Roadmap.
- Reuse the Wheel.
- Get Really Productive.
- Automate Repetitive Processes.
- Validate Your Design.
- Offer Additional Services.
- Visualize BIM Data.
What does BIM mean?
Building Information Modeling
Building Information Modeling (BIM) is the foundation of digital transformation in the architecture, engineering, and construction (AEC) industry.
What is a construction execution plan?
A project execution plan is a document which is developed at the start of a construction project which outlines the framework for a project to follow. It outlines the roles and responsibilities of the various parties and how critical components of a project will be managed. The project execution plan is typically developed by the project team.
What is an implementation plan?
Implementing Solutions. Implementation involves executing the process improvements that have been developed throughout the life of the project.
What is BIM in construction management?
BIM or Building Information Modelling is a process for creating and managing information on a construction project across the project lifecycle. One of the key outputs of this process is the Building Information Model, the digital description of every aspect of the built asset.
What is execution plan?
Execution Plans. Execution plans enable you to describe simple, linear processes. Each execution plan contains one or more tasks. For example, an organization could create an execution plan for delivering a corporate standard PC that contains these tasks: Procure the PC from a supplier. Configure the PC according to requester specifications.